Metro is almost ready

This post is also available in: Spanish

Line One of Panama Metro is 90 percent complete and currently the works to energize the overhead power lines and systems are taking place. The future Operations Center is at the 5 de mayo station. The trains from Europe are being put in storage there. Currently there are eight of the 20 wagons ordered.

In the semi-underground Albrook station a pedestrian gangway 175 meters long and eight meters wide is being built to join the Albrook Gran Terminal with the station. It is expected that that Line One will be ready for test at the beginning of 2014.

1_opt 2_opt

Authors

Related posts

Top